Contact

Get in touch

Questions about your block, our service area, or what we can do before summer. We'll get back to you.

After a price? Book a free quote and we'll come out and look at the block.

Book a Free Quote

Send us a message

Tell us what you need and we'll come back to you.

Taking enquiries now, assessments from November 2026

BAL assessments for Perth Hills builds and renovations.

If you're building in a bushfire-prone area, you'll need a Bushfire Attack Level rating before your application goes anywhere. Get on the list and we'll be in touch as soon as we're accredited.

The basics

What is a BAL assessment?

A Bushfire Attack Level assessment measures how much bushfire exposure a building site is likely to face. It looks at the vegetation around the site, how far away it is, the slope it sits on, and the fire danger index for the area.

The result is a rating, and that rating determines the construction standard your build has to meet under Australian Standard AS 3959. It's usually one of the first things a shire or building surveyor will ask for.

It matters more than most people expect, because the rating drives real cost. The difference between a low rating and a high one can be tens of thousands of dollars in construction requirements, so getting it assessed properly rather than conservatively is worth actual money.

The ratings

The six levels

Each level carries different construction requirements. Higher rating, stricter build.

  • BAL LOW

    Insufficient risk to warrant specific construction requirements.

  • BAL 12.5

    Risk of ember attack. Basic construction requirements apply.

  • BAL 19

    Increasing ember attack and burning debris, with some heat exposure.

  • BAL 29

    Heightened ember attack and burning debris, with increasing heat exposure.

  • BAL 40

    Increased heat exposure, ember attack, and the likelihood of flame contact.

  • BAL FZ

    Flame Zone. Direct exposure to flames. The most demanding construction requirements.

Who needs one

If your property is in a designated bushfire-prone area, a BAL is usually required before approval.

Building a new home

A BAL is required as part of the building permit application in bushfire-prone areas. Best done early, because the rating shapes design decisions and budget before you're committed to either.

Extensions and renovations

Significant additions to an existing building generally trigger the same requirement. Worth checking before you finalise plans rather than after.

Sheds and outbuildings

Habitable outbuildings, granny flats and some larger structures can also require an assessment, depending on the shire and the use.

Subdivisions

Creating new lots in a bushfire-prone area usually needs bushfire assessment as part of the planning process, often alongside a management plan.

Rebuilds

Replacing a building on an existing site typically requires a current assessment, even where a previous one was done years ago.

Not sure?

Your shire or building surveyor will tell you whether your site is in a designated bushfire-prone area. If you've been asked for a BAL, you need one.

Why Firezone

The assessor who also clears blocks

Most BAL assessors do assessments and nothing else. They arrive, measure the vegetation, produce a rating, and leave.

We do the assessment and the work. That matters because vegetation classification and distance are what set your rating, and in some cases managed vegetation can change where you land on the scale. An assessor who also does clearing can tell you whether that's a realistic option on your block or a waste of time.

Brad also started his flying career as a fire spotter, which means he's spent time looking at how fire actually moves across country rather than only reading about it in a standard.

Straight about where we are

BAL assessments for statutory purposes must be carried out by an accredited practitioner. Brad's accreditation course is booked and we'll be taking assessments from November 2026.

We're not taking BAL bookings before then, and we won't tell you otherwise. If you need one urgently, we'd rather point you to someone accredited now than string you along.

Questions we get asked

When can you actually do my BAL?

From November 2026, once accreditation is complete. The course is booked. If you register your interest now we'll contact you as soon as we're taking bookings, and you'll be near the front of the queue.

What if I need one before November?

Tell us and we'll point you toward an accredited assessor who can help now. We'd rather you got it done than waited on us.

How long does an assessment take?

The site visit itself is usually an hour or two depending on the size and complexity of the property. The written report follows after that.

Can I lower my BAL rating?

Sometimes. The rating is driven by vegetation type, distance and slope, so in some cases managed vegetation or a change to where the building sits can shift the outcome. It depends entirely on the site, and we'll tell you honestly whether it's worth pursuing on yours.

How long is a BAL assessment valid?

There's no fixed expiry, but it reflects site conditions at the time of assessment. Vegetation grows and neighbouring properties change, so surveyors and shires generally want a current one. If yours is a few years old, expect to need it redone.

Is a BAL the same as a Bushfire Management Plan?

No. A BAL is a rating for a specific building site that determines construction standards. A Bushfire Management Plan is a broader document, usually required for planning approvals and subdivisions, covering how bushfire risk will be managed across the site. We'll be offering management plans from 2027.

Get on the list for November

Tell us about your project and we'll be in touch the moment we're taking BAL bookings.

Register Your Interest